So far, we've completed the following things on the "Honey-Do" list:
* Taken the sails in for repair
* Found out we needed to replace the standing rigging
* Found out we need to replace the running rigging
* Re-wired the trailer
* Added a hitch to my car and wired it
* Redesigned the rudder assembly cause the original one is at the bottom of Lake Hopatcong!
* Re-wired the boat for running lights, anchor lights, a bilge pump and an electric trolling motor
* Cleaned her! (see pic of the clean boat and grubby crew!)
* Made a nuisance of myself at two marinas and 3 online boat suppliers
* Learned how to do eye splices using a Fid and using up a lot of patience
* Refinished the wood on board
* Added jib fairlead blocks (does this sound like gibberish to you? Welcome to the world of sailing!)
* Removed old nasty delaminated plywood because someone did not use marine grade plywood all around the cockpit!