« First Fix | Main | Here's our list of current things to be done »

What's been done

So far, we've completed the following things on the "Honey-Do" list:

* Taken the sails in for repair
* Found out we needed to replace the standing rigging
* Found out we need to replace the running rigging
* Re-wired the trailer
* Added a hitch to my car and wired it
* Redesigned the rudder assembly cause the original one is at the bottom of Lake Hopatcong!
* Re-wired the boat for running lights, anchor lights, a bilge pump and an electric trolling motor
* Cleaned her! (see pic of the clean boat and grubby crew!)
* Made a nuisance of myself at two marinas and 3 online boat suppliers
* Learned how to do eye splices using a Fid and using up a lot of patience
* Refinished the wood on board
* Added jib fairlead blocks (does this sound like gibberish to you? Welcome to the world of sailing!)
* Removed old nasty delaminated plywood because someone did not use marine grade plywood all around the cockpit!

TrackBack

TrackBack URL for this entry:
http://208.115.234.218:1226/cgi-bin/mt/mt-tb.cgi/30

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

About

This page contains a single entry from the blog posted on January 14, 2007 9:12 PM.

The previous post in this blog was First Fix.

The next post in this blog is Here's our list of current things to be done.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type 3.34